Programme: Urban development grants
Status: Completed
Project duration:
January 2017 – December 2021
With the model building procedure, the GEG provides for a simplified verification procedure for certain residential buildings. The expert opinion defines the requirements under material law as well as the necessary characteristic values for the issuing of energy …
Programme: Future Building
Status: Completed
Project duration:
February 2018 – March 2020
The introduction of the energy certificate is part of the implementation of the European Directive 2010/31/EU (formerly 2002/91/EC) on the overall efficiency of buildings. The energy certificate is also intended to make an important contribution to achieving climate …
Programme: Future Building
Status: Completed
Project duration:
November 2018 – December 2021
Official statistics fail to adequately capture the market of existing buildings in German residential and non-residential construction. The goal of this research project was to gather topical and reliable data on inventory activities in residential and non-residential …
Programme: Future Building
Status: Completed
Project duration:
October 2018 – March 2020
Since 2009, the Federal Office for Building and Regional Planning (BBSR) has been gathering information on municipal property portfolios through nationwide surveys every three years. The ExWoSt research project ‘Expansion of municipal property portfolios through …
Programme: ExWoSt
Status: Completed
Project duration:
November 2017 – December 2020
In energy requirement calculations for public law verification, the climatic boundary conditions of the Potsdam site have so far been used uniformly for the whole of Germany. By using local climate data, the difference between calculated demand and measured consumption …
Programme: Future Building
Status: Completed
Project duration:
September 2018 – June 2020
In the case of complex construction measures, the conclusion of construction contracts in a legal form other than that of the unit price contract could be conducive to project implementation in order to comply with or optimise construction time, costs and quality …
Programme: Future Building
Status: Completed
Project duration:
August 2017 – February 2020
Regarding the high construction costs of parking spaces, the "Commission to Reduce Building Costs" recommended that the states and municipalities adapt the parking space requirements to today's demand as part of careful urban development planning. At the conference …
Programme: Future Building
Status: Completed
Project duration:
December 2016 – December 2019
The Assessment System for Sustainable Building for Federal Buildings (BNB) is a holistic assessment procedure for office and administrative buildings. The aim of the project was to update, further develop and supplement the information brochure "Assessment System for …
Programme: Future Building
Status: Completed
Project duration:
August 2017 – November 2019
The Sustainable Building Assessment System (BNB), which has been in use since 2011 for the holistic consideration and assessment of sustainability aspects for buildings, was expanded in 2013 to include "analogous application". This scope of application is to be expanded …
Programme: Future Building
Status: Completed
Project duration:
August 2018 – November 2019